ROAD CLOSINGS AND TRAFFIC ADVISORIES

THE FOLLOWING ARE SUBJECT TO CHANGE

Thursday, September 3, 2015

Division Street (from Lee Street to Holley Street) will be closed starting immediately to all traffic.  This section of roadway will be closed for the next 48 hours due to an ongoing emergency. Traffic will flow North on Holley Street and Lee Street to Back Bay Boulevard.

Main Street and Lameuse Street will be closed to through traffic beginning Tuesday, September 1st through Tuesday, September 15th during working hours (7:00 a.m. to 7:00 p.m.) each day while crews install sewer mains.

Pass Road westbound (from Goose Pointe to Westview Drive) can expect lane shifts on Monday, August 31st while crews setup equipment to begin repairing drainage boxes in the right lane of the aforementioned portion of Pass Road. Weather permitting, work should be completed in early or mid-November of this year. Please use caution while driving along this portion of Pass Road. Eastbound Pass Road traffic will not be able to use the center turn lane while westbound traffic is shifted. Orange barrels and signage will be in-place to direct motorists through the lane shift.

Dorries Street (from Division Street to Railroad Street) will be closed to through traffic beginning Monday, August 24th through Monday, September 14th during working hours (7:00 a.m. to 7:00 p.m.) each day.

Old Highway 67 (from Wren Place, south to Woolmarket Road) will have intermittent one lane closures beginning Monday, August 3rd while crews begin installing sewer mains along the south bound lane of said portion of Old Hwy 67.  Weather permitting, the sewer main work along Old Highway 67 should be completed in eight to ten weeks.

 Larkin Drive (in Woolmarket) will have intermittent one-lane closures beginning Monday, August 3rd while crews install sewer services.   Weather permitting, work should be completed in one to two months.

Bayview Avenue (between Holley Street and Crawford Street) is permanently closed until further notice.

 Maple Street (From 7TH Street South) will have ongoing work which will cause traffic to detour to the East and West on 7th Street. Also a portion of 6th Street will be closed beginning Monday, January 14th until the end of December.

NORTH CONTRACT PROJECT Utility replacement and roadway repair work will begin in this area in mid 2014 and continue until late 2017, expect intermittent lane closures on the following street:

Oak Street

7th Street

8th Street

 –

HOSPITAL PHASES 1 & 2 PROJECT Utility replacement and roadway repair work will continue in this area until late 2014, expect intermittent lane closures on the following streets:

Bayshore Drive                                     Lafayette Street

Benachi Avenue                                    Lasalle Street

Beverly Drive                                        Luke Drive

Concord Drive                                       Oaklawn Place

Donwood Place                                    Porter Avenue

Forrest Avenue                                      Yorkshire Drive

Kensington Drive

EAGLE POINT PHASE 1 PROJECT Utility replacement and roadway repair work will begin in early 2014 in this area and continue until mid 2015, expect intermittent lane closures on the following streets:

 

Bayview Lane                                        Ridgewood Lane

Doty Street                                           Rivere Vue Drive

East Shore Crest Drive                          Shady Place

French Court                                         Shorecrest Road

Leisure Lane                                          Shore Cove

Pak Cove                                              South River Drive

Pin Oak Drive                                        West Oaklawn Road

Street Sweeping Schedule

Police Radar Schedule

For this week, the radar trailers will be placed at the following locations, in response to citizen complaints: