Traffic

City of Biloxi, Public Works Department

ROAD CLOSINGS AND TRAFFIC ADVISORIES

-

Friday, October 24, 2014

THE FOLLOWING ARE SUBJECT TO CHANGE DUE TO WEATHER OR UNFORSEEN CIRCUMSTANCES.

-

Update ANGLADA STREET (FROM BAYVIEW AVENUE TO DIVISION STREET) will be closed to through traffic starting Tuesday, October 28th through Friday, November 21st during working hours as part of the infrastructure repair work.

-

INTERSECTION OF SHORECREST DRIVE, EAST SHORECREST DRIVE, BAYOU CIRCLE, AND SOUTH RIVER DRIVE will be closed starting Thursday, October 22nd through Friday, October 24th.

-

KUHN STREET (FROM LAUREL COURT TO DIVISION STREET) will be closed starting Monday, October 27th through Friday, November 21st during working hours as part of the infrastructure repair work.

 -

LAUREL COURT (FROM KUHN STREET TO DIVISION STREET) will be closed starting Monday, October 27th through Friday, November 21st during working hours as part of the infrastructure repair work.

 -

ESTERS BOULEVARD, NORTH OF THE RAILROAD TRACKS (FROM LEE STREET TO DORRIES STREET) will be closed starting Monday, October 27th through Friday, December 5th during working hours as part of the infrastructure repair work.

 -

HOLLEY STREET (FROM DIVISION STREET TO NORTH RAILROAD STREET) will be closed starting Monday, November 3rd through Monday, December 1st during working hours as part of the infrastructure repair work.

 -

BOWEN STREET (FROM DIVISION STREET TO ESTERS BOULEVARD) will be closed starting Thursday, November 6th through Monday, December 1st during working hours as part of the infrastructure repair work.

 

KEESLER AFB:  STATE STREET (FROM BLEUER DRIVE TO RODENBERG AVENUE) will have utility work in the middle of the road to replace a corroded gas main starting Thursday, October 23rd through Friday, February 20th.  Please avoid this area or be prepared for delays and detours.

-

ESTERS BOULEVARD, NORTH OF THE RAILROAD TRACKS (FROM DELAUNEY STREET TO MAGNOLIA STREET) will be closed to all traffic starting Monday, October 20th from 7:00 am until Tuesday, October 21st at 6:00 pm.  Work crews will be demolishing the old Public Works building.

-

DELAUNEY STREET (NORTH OF RAIL ROAD TRACKS) will have the Southbound lane closed starting Monday, October 20th from 7:00 am until Tuesday, October 21st at 6:00 pm.  Work crews will be demolishing the old Public Works building.

-

NOTICE:   TRAFFIC CONTROL SIGNAGE AT THE INTERSECTION OF MIRAMAR AVENUE AND GLEN SWETMAN STREET HAS CHANGED, EFFECTIVE IMMEDIATELY.

 

NOTICE:   TRAFFIC CONTROL SIGNAGE AT THE INTERSECTON OF BENACHI AVENUE AND DESOTO STREET HAS CHANGED, EFFECTIVE IMMEDIATELY.

 

STRANGI AVENUE (FROM DIVISION STREET TO DORRIES STREET) will be closed to through traffic starting Friday, October 17th through Friday, October 24th during working hours only.  Be prepared for detours.

 -

 

Updated DORRIES STREET (FROM DIVISION STREET TO STRANGI AVENUE) will be closed to through traffic starting Friday, October 17th through Friday, November 7th during working hours only.  Be prepared for detours.

 

 -

 

Updated FOUNTAIN LANE (FROM DIVISION STREET TO NORTH RAILROAD STREET) will be closed to through traffic starting Friday, October 17th through Friday, November 14th during working hours only.  Be prepared for detours.

 

 -

 

Updated BROWN STREET (FROM DIVISION STREET TO NORTH RAILROAD STREET) will be closed to through traffic starting Thursday, October 23rd through Friday, November 14th during working hours only.  Be prepared for detours.

 

 -

 

Updated MAGNOLIA STREET (FROM DIVISION STREET TO CIDER STREET) will be closed during working hours starting Monday, October 13th through Friday, November 21st.  Be prepared for detours.

 -

BRADFORD STREET (FROM HAISE STREET TO CROESUS STREET) will be closed during working hours starting Monday, October 13th through Friday, October 31st.  Be prepared for detours.

 -

OAKRIDGE CIRCLE will be closed to through traffic starting Monday, October 13th through Monday, October 27th   to allow drainage repairs.  This will be a 24 hour-a-day closure with access maintained for local residents.

-

JOHN LEE ROAD (NORTH OF JOLLY ROAD) will have intermittent lane closures beginning Thursday, October 16th while crews make roadway repairs and begin overlaying the road with new asphalt.  Please use caution along work zones.  Weather permitting, repairs and paving should be completed in one to two weeks.

 -

JOLLY ROAD will have intermittent lane closures beginning Thursday, October 16th while crews begin overlaying the road with new asphalt.  Weather permitting, repairs should be completed in one week.

 -

JOHN LEE ROAD (FROM LORRAINE ROAD, NORTH TO JOLLY ROAD) will have intermittent lane closures beginning Monday, October 20th while crews make roadway repairs and begin overlaying the road with new asphalt.  Please use caution along work zones.  Weather permitting, repairs should be completed in one to two weeks.

-

CRAWFORD STREET (FROM DIVISION STREET TO BOYS CLUB LANE) will be closed to through traffic starting Monday, October 6th through Friday, October 24th from 7:00 am to 7:00 pm each day as part of the infrastructure repair work.

  

Updated FAYARD STREET (FROM ELDER STREET TO DIVISION STREET) will be closed to through traffic starting Monday, October 6th through Friday, October, 31st from 7:00 am to 7:00 pm each day as part of the infrastructure repair work.

 -

Updated BAYSHORE DRIVE (FROM DIAZ STREET TO CAILLAVET STREET) will be closed starting Monday, October 6th through Friday, November 28th.  Westbound Traffic on Bayshore Drive will be detoured south on Caillavet Street to Bayview Drive west to Diaz Street North. Eastbound Traffic on Bayshore Drive will be detoured to Diaz Street South to Bayview Drive.

 -

MAPLE STREET (FROM 7TH STREET SOUTH) will have ongoing work which will cause traffic to detour to the East and West on 7th Street. Also a portion of 6th Street will be closed beginning Monday, January 14th until the end of December.

-

NORTH CONTRACT PROJECT Utility replacement and roadway repair work will begin in this area in mid 2014 and continue until late 2017, expect intermittent lane closures on the following street:

Oak Street

7th Street

8th Street

-

HOSPITAL PHASES 1 & 2 PROJECT Utility replacement and roadway repair work will continue in this area until late 2014, expect intermittent lane closures on the following streets:

Bayshore Drive                         Lafayette Street

Benachi Avenue                        Lasalle Street

Beverly Drive                             Luke Drive

Concord Drive                           Oaklawn Place

Donwood Place                         Porter Avenue

Forrest Avenue                          Yorkshire Drive

Kensington Drive

-

EAGLE POINT PHASE 1 PROJECT Utility replacement and roadway repair work will begin in early 2014 in this area and continue until mid 2015, expect intermittent lane closures on the following streets:

Bayview Lane                             Ridgewood Lane

Doty Street                                 Rivere Vue Drive

East Shore Crest Drive              Shady Place

French Court                              Shorecrest Road

Leisure Lane                               Shore Cove

Pak Cove                                    South River Drive

Pin Oak Drive                              West Oaklawn Road

-

Street Sweeping Schedule

The street sweeper is out of service for maintenance until further notice.

-

Police Radar Schedule

Radar trailers will located in the following locations for the week of October 20th through October 26th:

 

Bay Vista Drive

Bohn Street